ROWAD Modern Engineering Case Study

02 / 11
Project Card
Project information
Location:nAttakanIndustrial Region, Suez, EgyptnClient:nEgyptian Grinding Advanced Technology (EGAT)nConsultant:nCosmos-E Engineers & ConsultantsnSector:nIndustrial & Mega ProjectsnTechnology Providers:nSMS Group, Outotec

03 / 11
1. PROJECT OVERVIEW
has been selected to execute this national mega project, taking on full responsibility for civil, equipment erection, piping erection and prefabrication, electromechanical, and architectural works across the plantu2019s extensive and specialized zones. Our team has successfully managed the entire process from conceptual engineering to execution, all while adhering to tight deadlines. We delivered precision, scale, and speed that are unmatched in Egyptu2019s industrial sector.

04 / 11
2. SCOPE OF WORK
Our work encompassed every core area of the plantu2019s construction and infrastructure, including:nPIPING:nInstalled over 50,000 meters of piping across varying diameters for utilities, fire systems, and plant operations.nFabricated and installed 1,200 tons of high-pressure piping (up to 300 bar), integrating world-standard systems with German machinery.nARCHITECTURAL FINISHES & SUPPORT FACILITIES:nDelivered the complete architectural scope for support buildings, including administrative offices, maintenance workshops, security buildings, warehouses, and industrial structures, ensuring both functionality and visual consistency throughout the complex.nCIVIL WORKS:nExecuted over 500,000 mu00b3 of reinforced concrete and 50,000 tons of steel reinforcement, providing the structural backbone for the entire facility.nINFRASTRUCTURE & ROADS:nInstalled 75,000 mu00b3 of heavy-duty road concrete across 210,000 mu00b2 with a 30 cm slab thickness, designed to accommodate high-capacity industrial traffic-all completed within a record timeframe of 3-4 months.nSECURITY & UTILITIES:nCompleted perimeter fencing, lighting, access control, and utility tie-ins, including water treatment systems, stormwater networks, potable water networks, sewage systems, drainage networks, firefighting
- Our work encompassed every core area of the plantu2019s construction and infrastructure, including:
- PIPING:
- Installed over 50,000 meters of piping across varying diameters for utilities, fire systems, and plant operations.
- Fabricated and installed 1,200 tons of high-pressure piping (up to 300 bar), integrating world-standard systems with German machinery.
- ARCHITECTURAL FINISHES & SUPPORT FACILITIES:
- Delivered the complete architectural scope for support buildings, including administrative offices, maintenance workshops, security buildings, warehouses, and industrial structures
- CIVIL WORKS:
- Executed over 500,000 mu00b3 of reinforced concrete and 50,000 tons of steel reinforcement, providing the structural backbone for the entire facility.

05 / 11
3. KEY QUANTITATIVE HIGHLIGHTS
Earthworks (Cubic meters)n3,400,000nPiling works (Linear meters)n1,810nConcrete Works (Cubic meters)n450,000nBuilding Works (Square meters)n52,430nEquipment Erection (Tons)n15,000nPiping Prefabrication (Inch/Dia)n62,000nPiping Erection (Inch/meter)n75,000nElectrical Works (Km of cables)n12,000nInstrumentation Works (Km of cables)n17,000nInsulation Works (Square meter)n294,000nPainting Works (Square meter)n114,000nPipeline (Linear meters)n122,000n4. COMMERCIAL ASPECTS AND WORKFORCE DEPLOYMENTnAmount of the contractn159,235,668.8USDnTotal spent direct man-hours (Mhrs)n25,704,000nDirect workers at peak (Number of Direct Workers)n400 engineers / 2,500 workersn% subcontractedn24%
- Earthworks (Cubic meters)
- 3,400,000
- Piling works (Linear meters)
- 1,810
- Concrete Works (Cubic meters)
- 450,000
- Building Works (Square meters)
- 52,430

06 / 11
5. PROJECT DURATION
Project Start daten04-9-2021nProject Completion daten30-9-2025n6. ENGINEERING CHALLENGESnThe projectu2019s strategic significance to Egyptu2019s industrial development classified it as a national priority, attracting heightened attention and oversight from key governmental authorities. Delivering within an accelerated timeframe was not just expected; it was essential.nROWAD Modern Engineering addressed this challenge through rigorous planning, disciplined execution, and seamless coordination with global suppliers, technology providers, and regulatory bodies. Despite the project's complexity and scale, all critical zones were completed in alignment with the national commissioning schedule, demonstrating our capacity to perform under high-stakes, nationally driven mandates.

07 / 11
5. ACHIEVEMENTS
This project showcased the full breadth of ROWADu2019s multidisciplinary expertise, particularly in the following areas:nMEGA-SCALE INDUSTRIAL EXECUTION:nSuccessfully managed and executed large-scale industrial operations, demonstrating ROWADu2019s capacity to handle complex projects efficiently.nINTEGRATED CIVIL & MEP DELIVERY:nAchieved seamless integration of civil and mechanical, electrical, and plumbing (MEP) systems, ensuring that all components function harmoniously and meet project specifications.nHIGH PRESSURE PIPING INSTALLATION:nCompleted high-pressure piping installations with precision, adhering to strict safety and quality standards, which is critical for the projectu2019s operational success.nFAST-TRACK INFRASTRUCTURE IMPLEMENTATION:nDelivered infrastructure components on an accelerated timeline, ensuring that the project met key milestones and deadlines without compromising quality.nHSE-CENTRIC OPERATIONS:nMaintained a strong focus on health, safety, and environmental (HSE) practices throughout the project, ensuring the well-being of all personnel and minimizing environmental impact.
- This project showcased the full breadth of ROWADu2019s multidisciplinary expertise, particularly in the following areas:
- MEGA-SCALE INDUSTRIAL EXECUTION:
- Successfully managed and executed large-scale industrial operations, demonstrating ROWADu2019s capacity to handle complex projects efficiently.
- INTEGRATED CIVIL & MEP DELIVERY:
- Achieved seamless integration of civil and mechanical, electrical, and plumbing (MEP) systems, ensuring that all components function harmoniously and meet project specifications.
- HIGH PRESSURE PIPING INSTALLATION:
- Completed high-pressure piping installations with precision, adhering to strict safety and quality standards, which is critical for the projectu2019s operational success.
- FAST-TRACK INFRASTRUCTURE IMPLEMENTATION:

08 / 11
7. CONCLUSION
These achievements not only highlight ROWADu2019s technical capabilities but also reinforce its commitment to delivering high-quality, safe, and sustainable solutions in the industrial sector.n8. STRATEGIC IMPACTnThe EGAT Industrial complex represents more than just a construction achievement; it serves as a strategic pillar for Egyptu2019s industrial future. With a production capacity of 5 million tons per year of iron pellets and 1.2 million tons per year of rail and heavy sections, this facility is pivotal to the nationu2019s industrial landscape.nROWAD Modern Engineering acted as a strategic execution partner in this nationally significant development project, playing an instrumental role in translating Egyptu2019s industrial vision into operational reality. As a key contributor to the projectu2019s success, ROWAD supported the governmentu2019s broader agenda for economic advancement and infrastructure-led growth. This engagement highlights our position as a trusted enabler of complex national initiatives, delivering high-impact solutions aligned with long-term development objectives.

09 / 11
Slide 09

10 / 11
Project Gallery