ROWAD Modern Engineering Case Study

02 / 09
Date of Establishment
2006nROWAD Modern Engineering's significant contributions to several major projects in Algeria across various sectors, including industrial facilities, logistics, metro works, infrastructure, and ports.nOur key references include:nEl Sewedy Cables FactorynEL SIEG Cement FactorynAlgiers Refinery Rehabilitation and Adaptation ProjectnMetrondu2019AlgernNew Autoroute innSu00e9tifnMost recently, ROWAD is actively contributing to thenDP World Port of Algiers Container Terminal,nwhich involves a comprehensive renovation and rehabilitation of the port and its supporting infrastructure.nWe are proud of our achievements in Algeria and look forward to further opportunities to make impactful contributions in the region.nROWAD ALGERIAnBranch Overview
- 2006
- ROWAD Modern Engineering's significant contributions to several major projects in Algeria across various sectors, including industrial facilities, logistics, metro works, infrastru
- Our key references include:
- El Sewedy Cables Factory
- EL SIEG Cement Factory
- Algiers Refinery Rehabilitation and Adaptation Project
- Metro
- du2019Alger

03 / 09
ELSEWEDY CABLES FACTORY IN ALGERIA
Client:nEl Sewedy CablesnClient Consultant:nECGnLand Space:n50,000 Mu00b2.nScope:nPrime ContractornConstruction ofnEl.SEWEDYnCables new factory in Algeria , works included: Civil, finishing & electromechanical worksnPROJECTS
- Client:
- El Sewedy Cables
- Client Consultant:
- Land Space:
- 50,000 Mu00b2.
- Scope:
- Prime Contractor

04 / 09
EL SIEG CEMENT FACTORY, Algeria.
Client:nOCInScope:nSubcontractornCivil works for all utility buildings in addition to some of the production line buildings such as the crushers & the Cement Mill buildingnPROJECTS

05 / 09
ALGIERS REFINERY REHABILITATION AND ADAPTION PROJECT , Algeria.
Owner:nSONATRACHnClient:nTECHNIPnScope:nSubcontractornConsists in the execution of the detailed engineering and design, procurement and construction of the following 19 technical buildings:nu2666 8 Electrical Substations (SS-12, SS-21, SS-22, SS-23, SS-24, SS-32, SS-41, SS-51)nu2666 1 Captive Power Plant (SS-CPP)nu2666 1 Switchyard (SS-YARD)nu2666 1 Central Control Room (CCR)nu2666 4 Satellite Rack Room (SRR-1, SRR-2, SRR-3, SRR-4)nu2666 1 Local Control Room (LCR-1)nu2666 2 Instrumentation Technical Room (ITR-1, ITR-2)nu2666 1 Laboratory (LAB)nPROJECTS
- Owner:
- SONATRACH
- Client:
- TECHNIP
- Scope:
- Subcontractor
- Consists in the execution of the detailed engineering and design, procurement and construction of the following 19 technical buildings:
- u2666 8 Electrical Substations (SS-12, SS-21, SS-22, SS-23, SS-24, SS-32, SS-41, SS-51)

06 / 09
METRO D'ALGER
Client:nAlgerian Transportation MinistrynScope:nSubcontractornConstruction of main complex, metro workshops & substationsnScope included: Civil works & finishing Works.nPROJECTS

07 / 09
PORT OF ALGIERS CONTAINER TERMINAL
Client:nDP WorldnDjazaiernClient Consultant:nEGIS InternationalnConsultant:nPacer / Nabarauy A&A Geotech / MECGnLand Space:n33,000 sqmnScope:nPrime ContractornManaging the Civil and MEP works for the rehabilitation of a 30-hectare container terminal operated by DP World.nThe project includes constructing foundations for Ship-to-Shore (STS) cranes along the quay wall, refurbishing the apron behind the quay walls, and reconstructing the yard with upgraded services and utilities. Additional components include underground oil trap tanks, fuel stations, weighbridges, and high-mast lighting systems.nPROJECTS
- Client:
- DP World
- Djazaier
- Client Consultant:
- EGIS International
- Consultant:
- Pacer / Nabarauy A&A Geotech / MECG
- Land Space:

08 / 09
NEW AUTOROUTE, Setif ALGERIA
Client:nAlgerian Transportation MinistrynFunded by:nEuropean Investment Bank (EIB), the Arab Fund for Economic and Social Development (AFESD), and the African Development Bank (AfDB).nScope:nContracted bynCojaaln, a large Japanese consortium, to carry out the construction of industrial structure crossing the road such as bridges, tunnels & culverts,nRowadu2019snscope included the construction of 36 bridges & 8 tunnelsn.nPROJECTS
- Client:
- Algerian Transportation Ministry
- Funded by:
- European Investment Bank (EIB), the Arab Fund for Economic and Social Development (AFESD), and the African Development Bank (AfDB).
- Scope:
- Contracted by
- Cojaal
- , a large Japanese consortium, to carry out the construction of industrial structure crossing the road such as bridges, tunnels & culverts,

09 / 09
Thank You
Explore More Case Studies
ROWAD Modern Engineering delivers complex multidisciplinary projects across strategic sectors.